SRA Toe Ditch
The SRA Toe Ditch runs parallel to the SRA Canal, originating immediately south of FM 1078 and west of FM 1130, and drains into Adams Bayou. The project consisted of deepening and widening the ditch to grade, beginning at a location near Adams Bayou and terminating at FM 1078. The project was completed in May of 2019.